Tower Crane Foundation Design Calculation Example -

Provide T20 @ 200 mm c/c (both directions top and bottom) → (A_s = 1570 , \textmm^2/m) ✓. Maximum tension per bolt from overturning (ULS): [ T_bolt = \fracM_dn \times r - \fracV_dn ] where (n=12) bolts, (r) = bolt circle radius ≈ 1.5 m. Approximate: [ T = \frac630012 \times 1.5 = 350 , \textkN \quad\text(ignoring vertical load compression) ] Check bolt capacity (M36, 8.8): (A_s = 817 , \textmm^2), (f_yb = 640 , \textMPa) [ N_Rd = 0.9 \times A_s \times f_yb / \gamma_M2 = 0.9\times817\times640 / 1.25 = 376 , \textkN > 350 , \textkN \quad \text✓ OK ] 8. Settlement Analysis Using elastic settlement for stiff clay ((E_s \approx 30 , \textMPa), (\nu=0.35)):

Maximum moment at crane column face (assume column base plate 2 m × 2 m): Tower Crane Foundation Design Calculation Example

This exceeds (q_allow = 150 , \textkPa) → or must be deepened or widened. 4.5 Revised foundation size Try (L = B = 7.0 , \textm, t = 1.5 , \textm): Provide T20 @ 200 mm c/c (both directions

For a 6 m square foundation, (L/6 = 1.0 , \textm). Since (e > L/6) (2.176 > 1.0), the resultant lies outside the middle third → partial uplift. Effective width (L' = 3 \times (L/2 - e) = 3 \times (3.0 - 2.176) = 2.472 , \textm). [ q_max = \frac2 \times N_totalB \times L' = \frac2 \times 19306.0 \times 2.472 = \frac386014.832 \approx 260.3 , \textkPa ] Settlement Analysis Using elastic settlement for stiff clay

Reinforcement required (per meter width, approximate): [ d = t - cover - \phi/2 = 1500 - 75 - 16 = 1409 , \textmm ] [ A_s = \fracM_Ed0.87 f_yk \times 0.9 d = \frac4473\times10^60.87\times500\times0.9\times1409 \times (1/7m)?? ] Let’s compute :